翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Daxing Line : ウィキペディア英語版
Daxing Line, Beijing Subway

| image = Xihongmen Sta site.jpg
| image_width = 265px
| image_alt =
| caption =
| type = Rapid transit
| system = Beijing Subway
| status = Operational
| locale =
| start = Gongyixiqiao
| end = Tiangongyuan
| stations = 11
| routes =
| ridership = 310,000 (2014 Avg. Daxing Line only)
376,000 (2014 Peak Daxing Line only)〔(【引用サイトリンク】title= 地铁日客流突破1100万人次 )
| open = 30 December 2010
| close =
| owner =
| operator = Beijing MTR Corporation Limited
| character =
| depot =
| stock =
| linelength = 21.7 km
| tracklength =
| notrack =
| gauge =
| el =
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
The Daxing Line of the Beijing Subway () is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Majialou, on the 4th Ring Road in Fengtai District, to Nanzhao Lu, beyond the 6th Ring Road in Daxing District. The Daxing Line is about 21.7 km in length with 18 km underground.〔(Chinese) ("地铁大兴线01号标段(义和庄站)开工建设" ''Daxing News'' ) Dec. 21, 2007〕〔(Chinese) ("地铁大兴线各站年底全封顶" ''京华时报'' ) Oct. 8, 2009〕 Of the 12 stations, only Xihongmen is above the surface.〔(Chinese) ("北京地铁大兴线6月1日开工 计划2011年底通车" ''Beijing Evening News'' ) May 15, 2008〕 (See map ()) Full-scale construction began in 2007 and the line was opened on December 30, 2010, 14:00 local time.〔(Chinese) () Apr. 20, 2010〕
==Route & Service==
Though the Daxing Line is classified as a distinct line,〔("北京地铁4号线今年年底将与大兴线贯通运营" ) news.china.com.cn. Retrieved 4 July 2010.〕 the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers. With the opening of the Daxing Line on December 30, 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:
* A full-route loop that covers the entire Line 4 and Daxing Lines. This train service runs from Anheqiao North, the northern terminus of Line 4, to Tiangongyuan, the southern terminus of the Daxing Line.
* A partial-route loop that covers the entire Line 4 route plus one stop on the Daxing Line. This service runs from Anheqiao North to Xingong, the northernmost stop on the newly opened Daxing Line. Travelers wishing to proceed further south on the Daxing Line would have to switch to a south-bound full-route service train.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Daxing Line, Beijing Subway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.